• Sponsor(s):
    Hillsborough County Public Works Stormwater Division
  • Principal Investigators:
  • Dates:
    January 2003 through September 2003

The Florida Center is working to update the GIS post-processing protocol developed in 2000 so that the steps can be carried out using the latest ESRI software suite. This project will focus entirely on the initial post-processing work that is currently assigned to the Specialized Services unit. This includes all post processing steps prior to the integration of the data with the County-wide stormwater layer, which are the steps presently assigned to the Modeling Team