The Water Institute has been working with the City since summer of 2014 to map accessible front yard meters as part of a Phase One project. To date, a total of 6,627 meters have been mapped out of a total of approximately 10,065 meters. The effort to map these meters was relatively rapid and efficient because the location of the meters did not require access to private back yards. This Phase Two project will not be as efficient because the mapping effort will include many back yard meters, and meters of unknown location that can be assumed to include many back yard locations.